Cad/Pad Spares Storage Facility

Cad/Pad Spares Storage Facility

This project is located at Hill Air Force Base. The storage facility is pre-engineered and has incorporates a moment frame structure. The floor was poured super flat in order to accommodate the fully automated recovery system that was installed into the building.

United States Army Reserve Center

United States Army Reserve Center

This project involved the construction of the following facilities: a reserve center, OMS building, hot mission warehouse, and an outside storage facility. The reserve center contains a concrete arms vault, mechanical and electrical rooms, lockers, showers, and a kitchen with an assembly/dining area.

Consolidated Range Dormitory

Consolidated Range Dormitory

This design build project involved the construction of an 85 unit, 155 personnel, Air Force dormitory, and the remodeling of an existing operations facility. The dormitory also features a post office, as well as recreation, study, vending, housekeeping, laundry, communications, and mechanical rooms.

SLC Air Traffic Control Tower

SLC Air Traffic Control Tower

Located at the Salt Lake City International Airport, this project required the construction of a new 325-foot tall control tower, and a two story base building. The facility includes lightning protection, an uninterruptible power system, standby emergency generator, computer facilities with raised floors, and a computer cooling systems.

VAMC Building 1 Renovation

VAMC Building 1 Renovation

The VA awarded three separate projects to Comtrol, the largest of which was the renovation of the Medical Center Building 1, followed by the Cardio-Curtain Wall and BioMed projects. In general, these projects provided for a total interior & exterior renovation of 3 wings, with 3 stories each of existing and occupied hospital patient facilities.